Crane Arrives!
(September 2008)

 

For the first week, Harry Decelle and his crew do all of the initial work using hand cranked lifts...

sept_08_0078.jpg

sept_08_0079.jpg

sept_08_0080.jpg

sept_08_0081.jpg

sept_08_0082.jpg

september1.jpg

september10.jpg

september11.jpg

september12.jpg

september13.jpg

september14.jpg

september15.jpg

september16.jpg

september18.jpg

sept_08_0060.jpg


 

Then the Crane Arrives
for the BIG stuff, and the first Posts Go
Up!

sept_08_0081.jpg

sept_08_0081.jpg

sept_08_0082.jpg

sept_08_0080.jpg

sept_08_0079.jpg

sept_08_0078.jpg

september2.jpg
With the lower posts in place, its time for a lunch and muscle break...
september3.jpg
...before the REAL work begins
(Neil in the middle w/ red hat)
september20.jpg
First they have to stage a scaffold
(its 6 levels tall - and on WHEELS!)
september21.jpg
Note the height indicated on the arm of the crane...
september22.jpg
Crane getting into position to lift the first hammer beam
truss
september23.jpg

september58.jpg
Neil watches from the bed of the crane
september25.jpg
Up it goes!
september26.jpg

september27.jpg
I
september28.jpg

september29.jpg

september30.jpg
The crane operator gently lowers the truss into place...
september35.jpg
...while Harry, on one side and another crewmember on the other side guide it into place
september33.jpg
Harry must really trust that crane operator...
september36.jpg

september47.jpg

september48.jpg

september49.jpg

september50.jpg
Each end has to be whacked into a snug fit and the lower braces attached
september51.jpg

september37.jpg
Then heavy straps are used to pull everything together and hold it in place when the crane LET'S GO!
september38.jpg

september39.jpg

september40.jpg

september32.jpg
It fits like a piece to a puzzle
september41.jpg
Crane is letting go
(That's way up there folks!)
september42.jpg
Now for the second one
september43.jpg

september44.jpg

september45.jpg

september46.jpg
Once the second one is placed...
september62.jpg

september66.jpg

september57.jpg

september65.jpg
... its time to connect the two with the ridge pole beam
september63.jpg

september53.jpg

september54.jpg

september55.jpg

september56.jpg

september52.jpg
 
september59.jpg

september60.jpg

september61.jpg

september64.jpg

september67.jpg
They call it a day...
september68.jpg
Right-side (Parking lot) view
september69.jpg

september70.jpg
South Facing (front) view
september71.jpg
View from the Gazebo
september72.jpg
Left -side view (cellar)
september74.jpg
Rear-View
(kitchen, warehouse, and bathrooms will be in this stick-built portion (the roof isn't up yet...)