Footing are Poured!



footings.jpg
Roughing in the plumbing
footings1.jpg
Neil (center) and
Joey Royal our contractor (red shirt)
footings2.jpg
Digging more footings
footings3.jpg

footings4.jpg
Parking lot view of the winery
footings5.jpg
Driveway view
footings6.jpg
Front View
footings7.jpg
Front View
pouring9.jpg
View from the gazebo
pouring1.jpg
Concrete trucks
arrive
pouring10.jpg
Lots of Concrete!
pouring11.jpg
Some of the crafted timbers are brought in
pouring12.jpg
More concrete
(another view from the lake/gazebo area)
pouring3.jpg
View from the
rear of winery
pouring4.jpg
Left side of Winery

pouring5.jpg
pouring5.jpg
pouring6.jpg
Left side of winery &
Outside e
ntrance to the winery cellar & production areas

pouring7.jpg
Left/rear side
view
sept_08_0060.jpg
The Structural Insulated Panels (SIPS) arrive and are staged ready to go.  They will become the sides and roof of the structure up as oon as the timber framing is up.
   




  Home